California (CARB) EVR Compliance
Executive Order VR-204-Z
- All Exhibits Includes all Exhibits below pdf
- VR-204-Z Legal Document pdf
Exhibits
- Exhibit 1 Equipment List pdf
- Exhibit 2 System Specifications pdf
- Exhibit 3 Manufacturing Performance Specifications and Warranties pdf
- Exhibit 4 Required Items in Conducting TP-201.3 pdf
- Exhibit 5 Liquid Removal Test Procedure pdf
- Exhibit 6 Required Items For Conducting TP-201.4 pdf
- Exhibit 7 Nozzle Bag Test Procedure pdf
- Exhibit 8 VST ECS; Hydrocarbon Sensor Verification Test Procedure pdf
- Exhibit 9 VST ECS; Determination of Processor Activation Pressure pdf
- Exhibit 10 VST ECS / Veeder-Root Vapor Polisher; Vapor Pressure Sensor Verification Test Procedure pdf
- Exhibit 11 Veeder-Root Vapor Polisher; Operability Test Procedure pdf
- Exhibit 12 Veeder-Root Vapor Polisher; Hydrocarbon Emissions Verification Test Procedure pdf
- Exhibit 13 Hirt VCS 100 Processor with Indicator Panel Operability Test Procedure pdf
- Exhibit 14 Franklin Fueling Systems Healy Clean Air Separator; Static Pressure Performance Test Procedure pdf
- Exhibit 15 VST Green Machine Compliance Test Procedure pdf
- Exhibit 16 Liquid Condensate Trap Compliance Test Procedure pdf
- Exhibit 17 Veeder-Root; ISD Vapor Flow Meter Operability Test Procedure pdf
- Exhibit 18 Veeder-Root Maintenance Tracker pdf
- Exhibit 19 INCON Flow Meter Operability Test Procedure pdf
- Exhibit 20 INCON PRessure Sensor Operability Test Procedure pdf
Modification Highlights
- All Changes Modification Highlights pdf
Installation, Operation and Maintenance Manuals (IOM)
and other materials
- Full IOM Includes Cover through all Sections below pdf
- Cover Cover pdf
- TOC Table of Contents pdf
- Section 1 Contractor Requirements pdf
- Section 2 Weekly Inspections pdf
- Section 3 Quarterly and Annual Inspections pdf
- Section 4 Alarm Troubleshooting Summary pdf
- Section 5 Drive-offs and Other Customer Abuse pdf
- Section 6 Phase II Coaxial Balance EVR Dripless Nozzles pdf
- Section 7 Phase II Coaxial EVR Nozzle Front-End Kits pdf
- Section 8 Phase II Coaxial EVR Balance Fuel Hose pdf
- Section 9 Phase II Coaxial EVR Balance Safety Breakaway Device pdf
- Section 10 VST ECS Membrane Processor: Installation pdf
- Section 11 VST ECS Membrane Processor: Operation, Maintenance, & Start-Up pdf
- Section 12 Veeder-Root: ISD Installation Manual pdf
- Section 13 Veeder-Root ISD/ VST ECS Membrane Processor/ Veeder-Root Vapor Polisher: Pressure Sensor Installation Guide pdf
- Section 14 Veeder-Root Vapor Polisher: Installation pdf
- Section 15 Veeder-Root ISD: Flow Meter Installation Guide pdf
- Section 16 Hirt VCS 100 Vapor Processor and Indicator Panel Installation Manual pdf
- Section 17 Installation Instructions for Healy Systems, Inc. Clean Air Separator pdf
- Section 18 VST Green Machine Installation and Maintenance Manual pdf
- Section 19 Veeder-Root TLS RF Wireless 2 System: Installation and Maintenance Guide pdf
- Section 20 Liquid Condensate Trap: Installation, Operations, and Maintenance Manual pdf
- Section 21 INCON VRM Operator Guide pdf
- Section 22 INCON VFM Install Guide pdf
- Section 23 INCON VPS Install Guide pdf
- Section 24 INCON DTU Console Side Install pdf
- Section 25 INCON DTU Dispenser Retrofit Install pdf
- Section 26 INCON Thermal Printer Install Retrofit pdf
- Section 27 Veeder-Root Vapor Pressure Sensor Vent Stack Install pdf
CARB Compliance Letters
- CARB #04/16 Alternate Potting Compound for Franklin Systems Vapor Flow Meter pdf
- CARB #09/10 Hold-open latch release mechanism addition letter pdf
- CARB #08/10 Removal of hold-open latches letter pdf
- CARB #11/07 Hanging Hardware Compatibility Letter pdf