California (CARB) EVR Compliance
Executive Order VR-202-Z
- All IOMs Full VR-202-X Download [ PDF – 9.69 MB ]
- VR-202-Z Legal Document pdf
Exhibits
- Exhibit 1 Equipment List pdf
- Exhibit 2 System Specifications pdf
- Exhibit 3 Manufacturing Performance Standards and Specifications pdf
- Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator pdf
- Exhibit 5 Vapor to Liquid Volume Ratio pdf
- Exhibit 6 Manufacturer Warranties pdf
- Exhibit 7 Nozzle Bag Test Procedure pdf
- Exhibit 8 Required Items in Conducting TP-201.3 pdf
- Exhibit 9 Veeder-Root ISD Operability Test Procedure pdf
- Exhibit 10 FFS INCON ISD Operability Test Procedure pdf
- Exhibit 11 Liquid Condensate Trap Compliance Test Procedure pdf
- Exhibit 12 Veeder-Root Maintenance Tracker (Optional) pdf
- Exhibit 13 Below-Grade Vaulted Tank Configuration pdf
Installation, Operation and Maintenance Manuals (IOM) and other materials
- Full IOM VR-202-R Includes Cover through all IOMs below [PDF – 34.0 MB]
- Cover Table of Contents pdf
- IOM 1 Scheduled Maintenance pdf
- IOM 2 Nozzle pdf
- IOM 3 Clean Air Separator Pressure Management System pdf
- IOM 4 Inverted Coaxial Hoses pdf
- IOM 5 Hose Adaptors pdf
- IOM 6 Re-connectable Breakaway Couplings pdf
- IOM 7 Flow Limiters pdf
- IOM 8 Dispensers with Healy Model VP1000 Vacuum Pump pdf
- IOM 9 Liquid Condensate Trap pdf
- IOM 10 Veeder-Root In-Station Diagnostics (ISD) pdf
- IOM 11 INCON/FFS Vapor Recovery Monitoring (VRM) pdf